...
Once you assign the job a name, select the Schedule job to run toggle to add the schedule details (or view the default schedule settings).
Info |
---|
SkySync DryvIQ highly recommends that you name the job to make it easy to identify. If you leave the name blank and save the job, a default name will be assigned to the job using the source and destination connections. |
...
Use this field to specify the number of times you want the job to run in a day. Once the jobs job runs this many times, it will not run again until the next day.
...
This option can be used in combination with the Starting date and Run job on fields. It cannot be used in combination with the Run job every option.
...
Defining a Stop Policy
Stop Policies can be set by selecting the Stop policy tab. The stop policy works in conjunction with the job schedule. It determines when a job should stop running. If a stop policy is not set for a scheduled job, the job will continue to run based on the set schedule until it is manually stopped or removed. Once a job meets the stop policy, its status changes to "Complete."
...
Stop after a number of total runs
Use this option option to set the total number of job runs that should occur. The job will only run the specified number of times.
Stop after a number of runs with no changes
Use this option option to stop the job once the specified number of runs occur without any changes to the content; all content has transferred successfully. Job executions that detect no changes do not need to be consecutive to increment your stop policy count. If new content is added to the source and the job runs again, this will not increment your stop policy count.
Stop after a number of failures
Use this option option to stop the job after the set number of failures are reached. Job executions that detect failures do not need to be consecutive to increment your stop policy count. Most failures are resolved through automatic retries. If the retries fail to resolve the failures, then manual intervention is required. This policy takes the job out of rotation so the issue can be investigated.
...
Stop after a specific date
Use this option to set a specific stop date for the job. The job will run according to the schedule and stop at 12:00 AM on the specified date.
Editing Job Schedules
Once you create a job, you can edit the schedule as needed. You have the option of editing one job schedule at a time of or bulk editing schedules.
Editing the Schedule for One Job
Select Jobs.
Search for the job.
When you hover to the left of the job name in the list
...
, a selection box appears. Click to select this box
...
. A check mark displays in the box to indicate the job has been selected.
Once you select a job,
...
More options text displays on the right side of the screen. Hover on More options, and select Manage schedule.
The Schedule job to run modal displays. Add or edit the job schedule as needed.
Select Done to save the changes and apply the new schedule to the job.
...
Editing the Schedule for Multiple Jobs
Select Jobs.
Search for the job.
When you hover to the left of the job name in the list
...
, a selection box appears. Click to select this box
...
. A check mark displays in the box to indicate the job has been selected.
Once you have selected multiple jobs, select the Manage Schedules button that displays on the right side of the screen.
The Schedule job to run modal displays. Add or edit the job schedule as needed.
Select Done to save the changes and apply the new schedule to the job.
...